Denver, CO
Dynalectric Colorado provided electrical upgrades for 260,205 square feet of hospital space at the Rose Medical Center.
Dynalectric Colorado delivered mission-critical emergency power infrastructure upgrades with no disruptions to Rose Medical Center’s daily operations.
Dynalectric Colorado has installed and maintained electrical systems at Rose Medical Center for nearly two decades, helping to keep this healthcare facility running smoothly.
For Ophthalmology Holdings’ medical office building, Dynalectric Colorado provided electrical infrastructure and design planning for each office, using prefabrication to maximize efficiency.
For this healthcare facility’s renovation and new construction, Dynalectric Colorado installed lighting, power distribution, fire alarm, and low-voltage systems.
For mission-critical upgrades to St. Mary’s Hospital, Dynalectric Colorado planned, designed, executed new power infrastructure installation—with minimal disruption to daily operations.